Boronów–Trzebinia petroleum products pipeline
In 2022, we completed work on the Boronów–Trzebinia petroleum products pipeline. Our team constructed crossings beneath different types of roads along the pipeline route.
Completed crossings
- Number of crossings: 40.
- Diameter: DN500.
- Combined length: 769 m.
The crossings enabled the pipeline to pass beneath roads. The work was carried out under the former TECHPOL name; the company now operates as GEOTECHNEX.